ALSTERN HOT TAPPING & VALVE INSERTION 2023 ISP HK

 

Location
Hong Kong – Infrastructural Network Provider

Project Completed
May 2023

Technical Details
Pipe Material  : Carbon Steel
Pipe Size  : DN 400
Medium  : Industrial Water
Pressure  : 3.5 Bar (50 psi)

Technical Challenges
The challenge was to modify an existing pipeline for future expansion with uninterrupted operation.

Technical Solutions
Hot Tap c/w By-Pass pipe and Valve Insertion was recommended to ensure the operation of the chilled water system was not affected with minimum risk consideration.

Our specialists first performed 2 sets of  Dia400mmxDia400mm Hot Tap on the main pipeline with full encirclement and full-bore Gate valve. The By-Pass pipe was connected between the new gate valve to the existing pipeline to create a continuous alternative flow.

After the system integrity check, Valve Insertion was adopted directly to insert a gate valve onto the existing pipeline to create a termination effect. The Valve Insertion was subsequently blind off with a flange to standby for future expansion works.

 

Get in touch with our representatives – Email Us

Call us at +65 6747 1527

Click for Contact Form

Share your concerns and our consultants will be in touch right away

Open chat
Got a query?
Hi!
We Solve Complex Engineering Challenges. How can we help you?