South-East Asia’s first large-scale underground electrical substation

 

Location

Government Project @ Labrador, Singapore

 

Project Scope

Building for an underground substation is resource intensive and requires specialised engineering capabilities. All equipment in the substation must be of low fire risk, with cooling systems to prevent heat build-up.

We were involved in this mega-project to construct drainage system in the raft foundation of basement four (B4). As part of the system, we installed more than 1800 metre length of Ductile Iron pipes and more than 500 accessories.

Our main challenge was to ensure accuracy of all pipelines and accessories as per requirement, before the continuous pour of 4-meter-deep concrete raft foundation (volume equivalent to 14 Olympic-sized swimming pools).

We completed this project successfully within scheduled and with zero accidents.

 

Get in touch with our representatives – Email Us

 

“We Solve Complex Engineering Challenges. All Day. Every Day”

CONTACT US FOR ENGINEERING PROJECT MANAGEMENT & OTHER SPECIALIZED SERVICES

Call us at +65 6747 1527

Click for Contact Form

Share your concerns and our consultants will be in touch right away

Open chat
Got a query?
Hi!
We Solve Complex Engineering Challenges. How can we help you?